![911-memorial-laying-in-pavers](http://gardnerfox.com/wp-content/uploads/commercial/2015/01/911-memorial-laying-in-pavers-12-19-14.jpg)
We are pleased to report that the pavers and wall are nearly complete, including electric conduit with wiring for lighting.
Bill Kopf, a member of the Washington Fire House 911 memorial committee, inspects the aluminum tube frame at the fabrication shop. The 12′ high frame will be finished with a black powder coat before installation.
Comments are closed.