Fast-track construction of a new state-of-the-art, 26,000 sf fiber optic telephone switch facility including renovation of a 23,000 sf building and a new 80 car parking lot with stormwater detention system. Extensive emergency back-up systems included two 800 kilowatt diesel generators, FM 200 fire suppression system, security systems, and redundant cooling systems. The second floor structure was designed for 400 pound per square foot loading, for use as a future battery room.